40.8 MW KOTO HYDROPOWER PLANT

     Salient features of the project:

  • Capacity 8MW
  • Net Head 63 m
  • Length of tunnel 1883 m
  • Design Discharge 126/sec
  • Turbine 3 Nos. Vertical Francis (13.6 MW Each)
  • Annual Energy 207 GWH
  • Tariff 8.241/kWh 

    Objectives of the project:

  • To develop the power potential available in Khyber Pakhtunkhwa, on sustainable basis
  • To provide cheaper, renewable, environment friendly and most needed power
  • To overcome the present and future requirements of Pakistan, especially rural and remote areas of province.

     Scope of Work:

  • Supply of Cable Trays and Electrical Items
  • Supply of skilled manpower as below,
  • Site Manager
  • Site supervisor
  • Technician
  • Site Engineer
  • Fitter
  • Fabricator
  • Welder
  • HSE Supervisor
  • HT Kit Electrician
  • Folder & Rigger
  • Helper
  • Labor for cable laying

 

3 x 1600 KW BATTAR HYDROPOWER REHABILITATION WORKS

Salient features of the project:

Ø  Annual Energy generated 30.9 GWH

Ø  Annual plant factor 60%

Ø     Design discharge 4.2 /s

Ø  Gross Head 158.53m

Ø  Net Head 152 m

Ø  Length of penstock 456 m

Ø  Diameter of Penstock 1.2-0.4 m

Ø  Installed capacity 4800 KW

Ø  No. of generators 3×1600 KW

Ø  Generation voltage 3.3KV

Ø  Power factor 0.8

Ø  Transformer capacity 2000Kva

Ø  Voltage ratio 3.3/11Kv

Ø  No. of units 03

Ø  Turbine type Francis

Ø  Discharge 1.4m3/s

 

Operation and Maintenance Services for 2.82 MW PAKPATTAN Hydro Power Project District Pakpattan, Punjab

Salient features of the project:

 

Ø  Turbine (2 Units): Double Regulated, Horizontal Shaft, Pit Type Kaplan Turbine.

Ø  Generator (2 Units) Rated Capacity 1.41 MW x 2

Ø  Power factor 0.8

Ø  Transformers (main) Rated Output 1.76 MVA.

Ø  Net energy generation 21.67 Gwh (Per annum)

 

Operation and Maintenance Services for 500 KW Raman Hydropower Project, Chitral.

Salient features of the project:

Ø  Installed Capacity :1× 500KW

Ø  Turbine Type: Francis

Ø  Rated Head: 76m

Ø  Rated Discharge: 33Cusec

Ø  Length and dia of penstock : 140m,76.2cm

 

Objectives of project:

Ø      To provide lightning, heating and cooking facilities for whole Raman, Harchen Valley.

Ø      To decrease the cutting of forest trees in the valley.

Ø      To improve the education, health and hygiene of the valley.

Ø To promote small enterprise and cottage industry in the valley.

 

Operation and Maintenance Services for 500 KW Pawoor Hydropower Project, Chitral.

Salient features of the Project:

Ø Installed Capacity :1× 800KW

Ø Turbine Type: Pelton

Ø Rated Head: 160m

Ø Rated Discharge: 26Cusec

Ø Length and dia of penstock : 450m,60.9cm

 

Objectives of Project:

Ø To provide lightning, heating and cooking facilities for whole Raman, Harchen Valley.

Ø To decrease the cutting of forest trees in the valley.

 

Operation and Maintenance Services for Shagore micro Hydel Chitral.

Salient features of the project:

Ø  Design Discharge                                                      27 m3 /s

Ø  Design Flood at Weir site (10,000 Year Flood)          971 m3 /s

Ø  Design Flood at Power House Site                            1815 m3 /s

Ø  Reservoir Length                                                        848 m.

Ø  Reservoir Area                                                            53483 m2 Max.

Ø  Reservoir Operating Level                                          2103 m.a.s.l. Min.

Ø  Reservoir Operating Level                                          2093.368 m.a.s.l.

Ø  Dead Storage Level                                                    2085.26 m.a.s.l.

Ø  Reservoir Capacity                                                     0.367 m3

Ø  Type of Construction                                                  CFRD

Ø  Height above River Bed                                             22 m

 

Objectives of Project:

Ø  To support the off-grid supply of renewable energy by community owned power utility companies.

Ø  Its usage to improve livelihoods, farm and business development in remote valleys in the Chitral District. 

 

7.64 MW Marala Hydro Power Project – (MHPP) Hydro Power Generation in Pakistan

Salient features of the project:

Ø  Plant Type                                         Low Head

Ø  Installed Capacity                             7.64 MW

Ø  No. of Units                                       04

Ø  Capacity of Each Unit                       1.91MW

Ø  Power Factor                                    0.8

Ø  Turbine                                              Pit Type Kaplan

Ø  Spillway Type                                    Gated (Radial Gates)

Ø  Mean Annual Discharge                    245 cumecs

Ø  Total Annual Flow                              7745 mil. m3/year

Ø  Headrace Channel Length                450 m

Ø  Design Discharge (cumecs)              420

Ø  Annual Water Requirement               8609.328

Ø     (Million  /Annum Rated Head (m) 2.16

Ø  Tailrace Channel Length                    480 m

Ø  Net Annual Energy Generation          43.37 Gwh

Ø Plant Factor (%)                                       65

MARALA HYDRO POWER PROJECT

SECRETARY ENERGY AND ADDITIONAL SECRETARY VISIT:

The Head Marala hydro power project has been completed at a cost of Rs 388.7 million which will produce 7.64 megawatt electricity. Asad Rehman Gilani Secretary Energy and Additional Secretary along with DC Sialkot visited Head Marala power project site to witness the progress and commissioning activities and said that the power project would generate 50.3 million units annually and 1.5 KM long transmission line of 11000 kV line had been laid and liked to Marala grid station. Punjab Chief Minister Shahbaz Sharif will inaugurate Head Marala hydro power project in near future. Later, the Provincial Secretary Energy along with other officers visited different areas.

PAWOOR HYDRO POWER PROJECT

IMRAN KHAN VISIT AT PAWOOR HPP: